Post Lamp
Date
February '24
Location
Mechanicsville
This install involved digging a hole 18 inches deep then feeding the existing wire through the top of the post. Then propping it before setting a layer of gravel around it topping it off with cement. Once the cement was stable enough support the post the outlet and photocell were installed on the sides of the post with the lamp being wired and secured to the top. The photocell was blocked and unblocked from light with the light switch on testing it for proper function.